Rapid Site Assembly
Our specially designed and equipped delivery trucks and tractor-trailers will deliver your new home in a precisely timed sequence that allows your crew (or your contractor's crew) to assemble the components as efficiently as possible.

First to arrive is the sub-floor package, conveniently placed next to your new home's foundation.

After you have installed the sub-floor the Basic Package is delivered. It consists of precision assembled exterior wall panels and interior wall partitions. Using the truck's boom crane, your Pageant Homes driver unloads the components as they are needed by the construction crew.

Once the walls are in place the roof trusses are delivered and lifted into place onto the top plates (limited area only and site conditions apply). This eliminates the heavy lifting often associated with roof trusses.

All these time and labor saving services are provided at no additional cost.